SEC logo
Investments

SEC Delburn Wind Farm

The SEC Delburn Wind Farm delivers Victoria’s first 100% publicly owned, utility-scale wind generation project just south of the Latrobe Valley in Gippsland.

Once operational in 2028, the 33-turbine wind farm will generate up to 205-megawatts of renewable energy, enough to power more than 130,000 homes.

SEC is working with OSMI Australia to build and deliver the project.

SEC’s anticipated capital expenditure of $600-$700 million brings significant local economic benefits, including more than 300 local jobs.

It will contribute more than $22 million in neighbour and community benefit sharing programs over its 35-year operational life.

The project also serves as beacon for renewable energy generation investment in the region – the historical heart of Victoria’s integrated power system.

Community Benefit Fund

In 2026, the SEC Delburn Wind Farm Community Benefit Fund will invest $150,000 in the communities surrounding the wind farm.

Applications for the Fund open on Friday 18 September 2026 and close on Friday 30 October 2026. Grants of up to $25,000 will support projects that strengthen local communities, enhance community facilities, build resilience and contribute to positive social, environmental and economic outcomes across the region.

Apply now

SEC is also looking for community members to play an important role in assessing and recommending funding applications. Learn more and apply here.

Employment

Across the construction of the project, our delivery partners will be recruiting a number of roles, which may include:

Delta Group

  • Cable joiners
  • Concreters
  • Dump truck drivers
  • Ecologists and arborists
  • Electricity installation
  • Excavator operators
  • Forklift operators
  • General labourers
  • Grader and dozer operators
  • Landscapers
  • Loader operators
  • Piling technicians
  • Pipelayers
  • Roller operators
  • Security
  • Steel fixers
  • Telehandler operators
  • Truck drivers
  • Watercart drivers

Delta Group and Vestas

  • Civil engineers
  • Construction supervisors
  • Electricians
  • Electrical trade assistants
  • Environmental specialists
  • Health and safety advisors
  • Project managers

Vestas

  • Service technicians

How to apply

Jobs will be advertised via Gippsland Jobs Hub. Or you can submit an expression of interest directly:
Vestas: delburn@vestas.com
Delta: gippslandenquiries@deltagroup.com.au

Industry and supply chain

Delta Group is expected to procure the following services to support construction of the project:

Delta Group (Construction phase)

  • Timber clearing
  • Trenching
  • Concrete supply
  • Steel supply
  • Foundations contractor
  • MV reticulation jointing
  • Aggregate supply
  • Cartage contractor
  • Stabilisation contractor
  • Traffic management
  • Fencing, weed management and general agricultural contractor
  • Ecology services
  • Water cartage and supply
  • Security installation
  • Commercial building
  • Amenities hire
  • Fleet vehicle supply and hire
  • Surveying services
  • Department of Transport approved civil contractors
  • Concrete pre-cast product suppliers
  • Mobile crane / franna hire
  • Waste management
  • Fuel supply and delivery
  • Plumbing services

Vestas (Operations phase from 2028)

  • Waste management
  • Cleaning
  • Furniture supply
  • Electrical maintenance

How to apply

Delta Group: Please email supplier expressions of interest to gippslandenquiries@deltagroup.com.au

Vestas: Please complete the supplier expressions of interest form here: vestas.com/en/about/our-partners/Suppliers/supplier-enquiry-form

Find out more about the project:

Download our:

If you would like to speak with a member of the team, please call 1300 305 700 between the hours of 9am - 5pm, Monday to Friday, or reach out via our contact us page. Sign up for project updates here: subscribe.

If you wish to make a complaint, you can do so here.

Learn more about our Community Consultative Committee here.

Location:

Delburn, VIC

Benefit:

130,000+

homes powered

Anticipated SEC capital expenditure:

$600-$700 million

Job creation:

300+

full-time equivalent

Wind turbines:

33

Generation capacity:

205

megawatts

Development partner:

OSMI Australia

Completion:

2028

Latest news:

Artists impression of Delburn Wind Farm

Community benefit fund opens for the SEC Delburn Wind Farm

18 September 2026

Community groups and not-for-profit organisations across Latrobe City, Baw Baw Shire and South Gippsland Shire can now apply for a share of $150,000 through the SEC Delburn Wind Farm Community Benefit Fund.

Baranduda

Baranduda 4.65-hour long duration battery set to support Victorian energy transition

17 September 2026

Aware Super, Birdwood and SEC are joining forces to deliver the Baranduda Electrical Energy Reserve, a 1.86 GWh Battery Energy Storage System located in Wodonga, Victoria designed to help keep Victorian power reliable as coal-fired generation retires.

Going electric at home: Do you need to upgrade your switchboard, meter or electricity supply?

08 September 2026

Thinking about going electric? Learn when your switchboard, meter, phase supply or mains connection may need upgrading, and how lots of homes can electrify without major upgrades.

SEC Renewable Energy Park - Horsham

Solar farm powers up - reaching critical milestone

03 September 2026

The SEC Renewable Energy Park – Horsham solar farm has connected to the electricity grid for the first time, bringing the project a step closer to generating 100% renewable electricity.